Finally…… Image heavy…. Bring on July…

A rather enjoyable afternoon taking images of the progress & editing them ready for web usage, as well as keeping the documentation of the Progress & changes…
I’m sure one fine evening in @ 5 years I’m going to go to the Big book shelf on the living room wall, lift off a Rather Large & Worthy Tome AND SMILE…

Managed to get through 73 frames with the D3s, and a wide angle… Well I wanted to see the place as a whole not have to piece together images like a jigsaw in PS just to understand ….

20140703-234830-85710067.jpg
I guess we best start outside….;-)
Not much changed since December last year in reality, the place IS watertight, after the two minor leaks were remedied…
Above the Kitchen window is where the a Dog Leg starts, the tiles up there were double drilled to secure them to the roof batons, BUT only 1 screw was used to secure them.!! Added to that was the complication of the Dog Leg.
The Ridge tiles, didn’t quite cover the top row of tiles… Leaving the single drilled hole open to the rain… The water ran down inner membrane & onto the Velux gap… Now solved…. Silicone & a second screw…!

The other minor leak was also solved, with a bloody good coating of Bitumen & a stiff brush….!
Water was gaining access down the concrete by the Gable end. & dripping slowly on to the deck.. But oddly enough, it only happened when the East Wind was blowing the rain towards the back of the house..! ??

Anyway, having the roofspace open, was a bonus as the leaks did no damage & were found over time & cured… A positive thing…

Inside we go then… Lower level, Accom 1, living room > Dining room…
Dining room will be in the area where the bike is parked…
A big space, 7.5M long by 4.5M wide…
The west facing side will be very light & open… Where the image was taken from….

20140703-235938-86378208.jpg

20140703-235937-86377864.jpg

Off to the right in the first image you can see a doorway …
This will lead to Bedroom 1, accom 1. 4M long by 3.5M wide…
West facing window.

20140704-000140-100798.jpg

You can see through door to bedroom ( off the living room ) another doorway to the far side which will be Bedroom 2….
Again a light & open space… Bigger room 5M by 5M, with a separate doorway off to the Bathroom …
The black line on the floor will be a dividing wall between bed2 & Kitchen passageway.
YOU ARE VIEWING FROM THE BATHROOM DOORWAY, kitchen to the Immediate Left..

20140704-000659-419595.jpg

UpStairs…
A superb bit of hand crafted skill from my Fathers hands….
A red pine Staircase, with twist…
Still covered in cardboard & tape to protect the treads until it’s all varnished & finished… It is a fantastic bit of skill & labour.
And on it… The Guardian of Her Domain…;-)
Though shalt not pass unless you have treats..!

20140704-001008-608470.jpg

20140704-001008-608779.jpg

20140704-001009-609081.jpg

The guest bedroom ( where I’m writing this from ) is at top of the stairs, west side, and you’ve seen that before… Besides it’s not Tidy…;-)
The same with the bathroom… Although it is now completely Plastered & ready for tiling & painting !!!
Shower ( Gucci one ) is working and the 3.6Bar pump is putting out a strong pressure…

20140704-001334-814576.jpg

20140704-001334-814283.jpg
The passageway ( 8Meters in length ) has three beams through it.. Entrance to kitchen & the Dining room opposite…
Both also finished ready for painting. & decorating…
Dining room on west side, kitchen east… Long thin kitchen, & Chauffe Eau room there too… Needs cupboard doors, but they are coming in July hopefully… Hopefully..

And onto the Living room… Le Sejour…. Grand Sejour….

7.5M across by 10M long. Huge… !!!
All lower walls plastered. & dry lined…
It SHOULD be said that my Eldest Nephew Paul Daglish did the dry lining , at my wife’s request, he would have skimmed it all… Even the awkward as hell sloping bits…!

You can see the rafters & beams, the OSB on the roof at the mo.
This week coming I will be insulating & cladding / strapping the inner roof… It’s 6M off the floor at central point…!
And YES… All that wood on show has indeed been coated & brushed with woodworm killer…! !!! A job that felt like painting the Forth Bridge…!!
In the first & third images, there is an unfinished Window Space…
This is a left over form the original building, & we are obliged to use it as it was a feature… Hopefully it will become a feature Stained Glass window at some point in the future, but tp it will forever be known as the Dog Window….:-) hahaha…

20140704-002417-1457898.jpg

20140704-002418-1458248.jpg

20140704-002418-1458576.jpg

20140704-002418-1458929.jpg

20140704-002419-1459294.jpg

As you can see it’s a huge space…. !!

But finally… Arty stuff….
The bit that makes me Smile at the end of EVERY DAY HERE….
Sunset…
The house faces Due West…. !!!

20140704-002642-1602116.jpg

20140704-002641-1601818.jpg

20140704-002642-1602401.jpg

Now that’s a VIEW…. !!!!!

Advertisements

About darkhorsephotos

Experienced Qualified Professional Photographer, Ex Miltary Royal Navy 24 years B.A Honours 1st Class Hons Currently Building a business & home in Normandy France. View all posts by darkhorsephotos

4 responses to “Finally…… Image heavy…. Bring on July…

  • Paul Jones

    Hey Andy. I’m in awe of the work you have put into this. It’s going to be magnifique when completed. 🙂

    • darkhorsephotos

      Thank you Paul….. Some big changes from the opening vision of the place…..

      Just done the bulk of the upstairs insulation ( all high tech silverfoil ) 15 rolls of 15Msq coverage each & several rolls of Fibre Glass wool…
      I’m sure you & Anne & Simon. & Jenny will take a holiday ‘ere sometime…

  • Rob Noble

    Andy how did the cladding go in the roof? I am considering adding to my little abode, only thing left with regards to insulation etc….will prpobably move now!!!!!!!!!! careful of the thunderstorms today!!

    • darkhorsephotos

      Cladding.???
      The silver foil ( Superquilt TRISO ) was easy to put up , need a good staple gun though… & a roll or two of Maskers, if it’s cut to fit a space, tape the cut edges to form a new edge…. Stops it falling apart once you cut the stitching.
      Quilt was €65 here….> equivalent to greater than 220mm thickness fibreglass…
      HAVE to batten it off after though… To give plasterboard something to bite into as the screws will rip it down.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: