FatBoy Slim > We’ve come a long way baby….

It’s been a bit of a good week weather wise, and with that, we have managed to make the Upper level of the house Watertight, or as near as damn it…. @ 95%….

The a East side is finished, barring the Chimney piece that’s now on order….
The West face, there’s Two full windows fitted & the frame in place for the Sliding Glass of the Third…
BUT because I still need @ 250 Tiles lifted onto the roof, there’s no Glass fitted yet to avoid possible damage etc…
BTW…250 tiles = 1 & 1/4 metric Tonnes.!!!! By hand..!!!

It was this evening I asked myself about how far we’d come … As the changes are gradual, it’s hard to step back & observe..

So I went to the Archives… And… Below is a compare & contrast..:-)

20131119-000824.jpg

20131119-000844.jpg

Advertisements

Momentous Days & Expensive Ones…

Momentous …… Such days are rare indeed, they only happen every 1000th Monday in your lifetime ( if you are lucky ) …

Everything seemed to happen on the same day…!

The Brand New A Frame ( in green oak ) is made & up….
It is now supporting the weight of the roof Truss, the ‘Orrible Breeze Block Wall can come down, but that’s Next Year…

20131103-210456.jpg

The Permis de Construire is complete, it gets handed in Monday Morning ..! 🙂
The entire East side of the Roof is ready for tiling. It’s all battened up & waiting…

20131103-204547.jpg

The Tiles… > around 7 Metric Tonnes have been lifted & Shifted, up to the ” Premier Etagé ” ready to be drilled & passed out the Window to be screwed individually to the Roof…
That’s 1/2 of the tiles…! Only 1/2… My back & arms ached…

The Windows Were Ordered & are due for collection Wednesday coming, the Fire / WoodBurning Stove was ordered two weeks ago, it’s also due for delivery this week…!
That’s 180Kg of Iron & Glass to go upstairs…!!!
The Windows WILL be every bit as heavy…. Well the Velux not quite so, but the three 2M 15cm x 1M 80cm wide Double Glazed PVC West Side Windows WILL BE…

The Fact that Two of the Dormers are almost ready for the retaining concrete walls to be knocked out & the gap ready for receiving them… They have been Sliced ready for the mallet & chisel job that will be Tuesday / Wednesday WEATHER permitting.?? More like Friday..

20131103-211556.jpg

Expensive…. Well they are much more common than their Momentous cousins..:-)

Things are Coming together nicely ……… But
The Three Velux Windows… The Three Large windows, the Stove / Woodburner & the A Frame & the Building Materials & the Tiles for the roof…. The Water Board Fees for Connection are a bit steep & the Electricity board fees will be equally Steep I’m sure… But a necessary evil ….

Expense was expected… But that’s life… And the Future… Our Future..